Skip to content

Guide · Coordination

How to build a lifeguard schedule, step by step

A good lifeguard schedule covers every tower in the contract with the right certification, respects the team’s hours and rest, and leaves room for absences. These are the steps.

Updated

1. Start from the contract

Before putting a name in a cell, write down what each contract requires:

  • Beaches and towers or posts to cover.
  • Service hours (for example, 10:00 to 19:00) and season dates.
  • Minimum staffing per post and extra cover required at weekends, on public holidays or in August.
  • Special posts: boat, quad, first-aid post.

2. List your team

List every lifeguard with their certification and its expiry date: open-water lifeguarding, defibrillator (AED) and, for boat posts, the relevant boating licence. Note availability, requested holidays and the hours each person has already worked this season.

Never assign someone to a post if their certification expires during the week of the schedule.

3. Define the shifts

Choose the shift pattern the contract needs: one continuous shift for the whole service window, or overlapping morning and afternoon shifts. Plan breaks too: sustained attention in a tower is tiring, and rotating between posts helps keep it up.

4. Respect hours and rest

Unless your collective agreement says otherwise, Spain’s Workers’ Statute sets, among other things:

  • A maximum of nine ordinary hours of actual work per day (article 34.3).
  • At least twelve hours of rest between the end of one working day and the start of the next (article 34.3).
  • A minimum weekly rest of one and a half uninterrupted days, which can be accumulated over up to fourteen days (article 37.1).

Always check the collective agreement that applies to your company: it may improve these conditions.

5. Assign towers and keep reserves

Fill the posts that need special certifications first, then the towers, then the extra cover. Keep at least one reserve per area on the busiest days: in August, a last-minute absence is almost certain.

TowerMonTueWedThuFriSatSun
Tower 1MVMVNGNGMVAFAF
Tower 2AFJPJPASASMVNG
Tower 3NGASMVMVPRPRJP
ReservePRPRAF—NGNGAS

6. Publish, communicate and review

Publish the schedule in advance and make sure every lifeguard sees it. When something changes, tell the person affected, not the whole group. At the end of the week, compare the schedule with the clock-ins: that is how you know whether the plan held.

Spreadsheet or software

A spreadsheet works for one beach and a small team. With several contracts, dozens of lifeguards and daily absences, lifeguard scheduling software saves hours and mistakes. Salvo, in development for the summer 2027 season, proposes the schedule with AI while respecting certifications, hours and rest, and rebuilds it when someone is off.

Frequently asked questions

How often should lifeguards rotate between towers?

It depends on the contract and on how busy the beach is. Many companies rotate posts during the day to share the load and keep attention up; what matters is that the tower is never left uncovered during the changeover.

How many hours can a lifeguard work per day in Spain?

As a general rule, the Workers’ Statute sets a maximum of nine ordinary hours of actual work per day and twelve hours of rest between working days, unless the collective agreement sets a different distribution.

Early access · 2027 season

Join the Salvo waitlist

The first lifeguard companies will use Salvo in the summer 2027 season. Sign up and we will write to you before we start.